Project Overview

Roshal Space Consultants Ltd was appointed to undertake loft roof insulation improvements within an NHS hospital building. The works involved the installation of new thermal insulation across approximately 350m² of loft space to improve the building’s thermal efficiency and insulation performance.

The works were carefully planned to ensure safe access, effective material handling and minimal disruption to the hospital’s day-to-day operations.

Scope of Works

Roshal operatives undertook the following works:

  • Access to the loft area was gained via the existing staircase to the rear of the building.

  • A Roshal cherry picker was used to transfer insulation materials onto the flat roof, with materials handled and transferred by Roshal operatives.

  • Approximately 350m² of loft insulation was installed between the existing timber joists.

  • The first insulation layer consisted of 100mm insulation rolls, installed between the joists.

  • A second 200mm insulation layer was installed over the first layer to provide additional thermal protection.

All insulation was carefully positioned to ensure consistent coverage across the designated loft area.

Health, Safety and Site Management

Due to the nature of the works and the hospital environment, particular attention was given to health and safety, including safe access arrangements, manual handling and the control of airborne dust and insulation fibres.

All Roshal operatives wore the appropriate PPE, including Type 5/6 hooded protective overalls and suitable dust masks, to minimise exposure to insulation fibres and airborne particles.

The working area was managed to maintain safe access and minimise disruption to hospital staff, patients and visitors.

Successful installation of approximately 350m² of upgraded loft insulation within a live NHS hospital environment, improving thermal insulation while maintaining strict health and safety standards and minimising disruption to hospital operations.

Project Completion and Handover

Upon completion, all waste materials, insulation offcuts, debris, health and safety signage, protective materials and barriers were removed from site.

The working area was thoroughly checked and left clean, tidy and safe, ready for client inspection and handover.

Project Outcome

Roshal Space Consultants Ltd successfully completed the loft insulation installation, delivering approximately 350m² of upgraded roof insulation within the NHS hospital.

The works were undertaken with a focus on safe working practices, effective site management and minimising disruption to the hospital environment, ensuring the completed installation was ready for client handover.